Skip to main content
A run of C9 bulbs clipped along a roof edge at dusk
Bob RiccaUnsplash
Install & DeliveryNot builtOct — Nov · The rush

Drag-and-drop Board

In November the calendar changes hourly and it lives on a whiteboard.

The install rush is six weeks of continuous re-planning. A board with crew lanes and draggable visits is the difference between re-planning a day in a minute and re-planning it in an hour of phone calls.

How it works

  1. 01

    A lane per crew

    Each crew is a row, each visit a block. Capacity is visible rather than remembered.

  2. 02

    Drag to move

    Move a visit between crews or days without opening it.

  3. 03

    Conflicts surface

    Double-booked crews and over-long days are visible before the morning they happen.

What it does not do

Not built yet. The scheduling and appointment APIs are shipped and the visits exist — the drag-and-drop surface over them is the outstanding work.

Works with

Not built yet. Tell us if it decides your season.

Roadmap order is decided by what actually blocks lighting companies. If this is the one you need, it moves up.